Archive for the ‘ATR’ Tag

400MW fully permitted projects for sale now

I have today for sale 7 fully-permitted wind energy projects in Romania – 394.5MW.
Also, some greenfield projects which are good value for money.

Next steps:

  1. NDA
  2. Information exchange about the portfolio (iterative)
  3. Letter-of-intent (LOI) and bank guarantee letter (or proof) for the requested amount
  4. Direct meeting seller-buyer
  5. Memorandum of understanding (MOU)
  6. Sale-purchase
Anunțuri

Contracte de racordare si avize de racordare (ATR) – situatia la zi

Grupul energetic ceh CEZ, proprietarul fostei Electrica Oltenia, are contracte de racordare de la Transelectrica, compania de stat de transport energie, pentru toti cei 600 MW pe eolian pe care vrea sa-i instaleze in Dobrogea, iar alte 25 de companii isi impart restul de contracte pentru 215,39 MW, potrivit datelor de la inceputul lunii aprilie, centralizate de Transelectrica.

Astfel, la inceputul lui aprilie existau contracte de racordare pentru 815,39 MW pe eolian si avize pentru inca 2.166 MW, capacitate care o depaseste pe cea a trei reactoare nucleare de la Cernavoda.

Potrivit Transelectrica, Eximprod are contract de racordare pentru 70 MW, EUROPP ENERGOCONS pentru 43 MW, Romwind pentru 36,4 MW, Custom Line Energy pentru 15 MW si Bridgeconstruct pentru 10 MW, iar restul se imparte intre mai multe firme care au capacitati de sub 10 MW.

Presedintele Autoritatii Nationale de Reglementare in domeniul Energiei (ANRE), Petru Lificiu, a explicat intr-un interviu acordat Business Standard ca la ora actuala sunt cereri de racordare la retea pentru circa 18.000 MW pe eolian.

“Din cei 18.000, aproximativ 3.000 MW pot fi preluati acum de reteaua Transelectrica fara probleme. Sunt contracte de racordare pentru putin peste cei 600 MW ai CEZ, iar pentru restul pana la 3.000 MW vom avea o ierarhizare, in sensul ca au prioritate cei care investesc si in linii, transformatoare si centrale de echilibrare pe gaze sau hidro”, a spus oficialul ANRE. Acesta a adaugat ca a avut, recent, o intalnire cu reprezentantii Transeletrica pe aceasta tema, iar autoritatea are ca prioritate si dezvoltarea zonei Moldovei prin atragerea de investitori care sa aloce fonduri pentru eoliene pe axa Vaslui-Iasi-Galati.

Recent, Transelectrica anunta ca, impreuna cu Electrica si firmele private de distributie a energiei aflate in portofoliile italienilor de la Enel, germanilor de la E.ON, respectiv cehilor de la CEZ, a acordat avize pentru racordarea la retea unor centrale eoliene care insumeaza circa 3.000 MW, aproape de limita maxima de suportabilitate a sistemului. Potrivit specialistilor, sunt multe companii care isi iau avize de racordare, dar putine ajung in faza de semnare a unui contract de racordare, ceea ce arata ca nu au capabilitatea de a duce proiectele mai departe, fie din cuza crizei, fie din cauza reglementarilor neclare.

Avizul de racordare este primul pas pentru infiintarea unui parc eolian, al doilea constand in incheierea unui contract de racordare si solicitarea autorizatiei de infiintare a centralei de la Autoritatea Nationala de Reglementare in domeniul Energiei – ANRE.

Romania are un potential pe energie eoliana de circa 14.000 MW, marile companii energetice au anuntat pana acum proiecte de peste zece miliarde euro in domeniu, dar, in contextul actual, au pus in stand-by respectivele planuri sau le redimensioneaza. Instabilitatea legislativa din Romania ii sperie pe investitori, poate la fel de mult ca si efectele crizei. Ultimele mutari facute de piata eoliana din Romania vin dinspre portughezii de la Martifer, care se afla in discutii cu un dezvoltator local pentru preluarea unui proiect de 35 MW, situat la Babadag, in Dobrogea, pentru o suma ce poate ajunge la sapte milioane de euro, dupa cum au declarat pentru Business Standard surse apropiate negocierilor.

Recent, Eviva Energy, o subsidiara locala a grupului portughez Martifer, a cumparat la finele anului trecut un pachet de 10% din capitalul firmei Ground Investment Corp din Bucuresti (care dezvolta respectivul proiect), pentru care a platit 0,675 milioane de euro.

Martifer are intr-o faza mai avansata si un proiect eolian dezvoltat in nume propriu, tot de circa 35 MW si tot la Babadag.

Sursa: Business Standard

Din alte surse (vezi post-urile precedente), proiectul de la Babadag al Martifer este de 60MW.

Radu Voinescu

Energie eoliana

Transelectrica to issue last wind energy approvals

[good or bad, this piece of news sounds important for us, ongoing developers; the source is http://ue.mae.ro/pdf/2009.04.27_highlights17.pdf, which is the Permanent Representation of Romania to the European Union]

 

 

 

 

Here goes:

Transelectrica to issue last wind energy approvals

The state-owned electricity distribution company Transelectrica, together with Electrica and the private energy distribution companies included in the portfolios of the Italian group Enel, the German company E.ON and the Czech CEZ concern approved until April the connection to the network of wind energy plants totaling 3,000 MW, close to the system’s ceiling, according to data sent to Business Standard by Transelectrica.

Practically speaking, from now on very few approvals will be given, according to officials of the state company, and soon these will stop altogether. “Connection approvals are being given, at a slower pace, because we expect that a large portion of the projects which have already been approved will not be finalized. We established that a total of some 3,000 MW is acceptable. We will exceed this, but not by much, so we will end up refusing applicants, at least temporarily,” the Head of Transelectrica’s Network Planning Division, Dan Preotescu, told Business Standard.

The ceiling for wind capacity which can be safely integrated into the system was set last year at 2,000 MW, based on estimates, as Romania has no experience in the field, and has only 11 MW installed. According to Preotescu, the experience of other countries showed that many companies that received connection approvals failed to complete the projects, which will also be the case in Romania. “There are few projects that reached the stage of signing the connection contracts. This means that many companies are unable to continue the projects”, the Transelectrica official said. He added the suggestion that the award of the connection approvals for the wind energy plants be conditioned by simultaneous investments in their own adjustment capacities from investors is still being debated, with no final decision having been reached so far. According to the last statement issued by Transelectrica, in April there were connection approvals for 2,981 new MW on the wind energy segment, up by some 515 MW against January. Out of the 2,981 MW approved, only 27 percent benefit from contracts for network connection. The connection network is the first step for the establishment of a wind energy park, with the second being the conclusion of a connection contract and the application for obtaining the establishment permit for the plant from the National Energy Regulatory Authority (ANRE).

“Very few connection contracts have been concluded, which means this field is still developing very slowly,” the daily Business Standard cites Marian Turbatu, president of the Romanian Wind Energy Association as saying.

 

 

[anyway, we cannot say we haven’t been warned; just a recent example]

Radu Voinescu

Energie eoliana

Dobrogea e plina…

…cel putin de intentii marete. Am vazut azi harta retelelor pe Tulcea si Constanta, cu capacitatea autorizata in diverse faze. Doar 30 de MW la Fantanele sunt in ultima faza, cu adevarat gata de bagat in priza. Restul e mai mult sau mai putin la stadiu de intentie sau de autorizare intermediara. Multe ATR-uri luate, insa ca sa semnezi Contractul de Racordare trebuie sa arati ca ai sau poti face rost de banii pentru dezvoltarea proiectului, si aici multi „viteji” se ineaca. Mai ales ca ATR-ul e valabil doar 6 luni si se poate prelungi doar o data, cu inca 6. Asa ca cine nu are ATR, sa astepte, ca se va mai elibera peisajul de dezvoltatori cu ghilimele, din care sunt sigur ca stim cu totii cel putin cativa.

Lansez o intrebare-pariu: cati MW credeti ca vom vedea instalati si in functiune la sfarsitul lui 2009? Dar 2010?

Toate cele bune!

%d blogeri au apreciat asta: