Archive for the ‘Tulcea’ Tag

Mihai Bravu

The following project has been sold, after more than one year of presentations, negociations, due-dilligence, questions etc:

Windstudy and offer  (click right – save target as)

Environmental Assessment (click right – save target as)

Google Earth files (property, environment, micrositing, connection)

It’s a beautiful project, that I care a lot about. Good luck to the developers!

Anunțuri

Se ieftineste investitia in energie eoliana

Cat costa investitia in energie eoliana

Suzlon: Un MW pe eolian costa 1 mil. €, mai putin cu 20%

Pretul total al unui megawatt (MW) instalat in centrale eoliene a scazut cu aproximativ 20% anul acesta fata de 2008, ajungand la circa 1 mil. euro, pe fondul crizei financiare, a declarat pentru Business Standard Peter Rosenberg, senior sales manager al companiei Suzlon Wind Energy, parte a grupului Suzlon, furnizorul numarul cinci mondial de turbine, prezent si pe piata locala.

“Pretul de piata pe un MW eolian a ajuns la circa 1 mil.euro, fata de 1,2-1,3 mil. euro in urma cu un an, scazand costul echipamentelor, al serviciilor sau cel cu instalarea. Si noi am redus pretul, in toata piata s-a intamplat acest lucru”, a spus oficialul. Compania a incheiat pana acum in Romania un singur contract de livrare turbine cu portughezii de la Martifer, pentru o capacitate de 60,9 MW, ce va fi instalata la Babadag (jud. Tulcea). Pentru a asigura service-ul echipamentelor si lucrarile de mentenanta, Suzlon si-a deschis anul trecut in noiembrie o reprezentanta locala, care va furniza servicii si pentru proiectele viitoare, posibil si pentru cele derulate in Bulgaria. De altfel, Suzlon se afla in discutii cu doua companii care vor sa dezvolte proiecte eoliene pe plan local cu o capacitate totala de circa 120 MW. Potrivit lui Rosenberg, una dintre tendintele pietei este ca dezvoltatorii sa mearga pe proiecte cu capacitati de pana la 6-10 MW, care sa fie extinse cand piata isi va reveni.

Sursa: Business Standard

Radu Voinescu

Energie eoliana

Tulcea – situatia la zi

Pentru acei dintre Dumneavoastra care se intreaba care e situatia la zi in energia eoliana din Romania, concret, pe teren, iata un rezumat al zilei de azi.

Turnuri de masura de vant – cam tot alea sunt. Le-am invatat pe dinafara. Dupa numarul lor, vom avea parte de cateva zeci de proiecte in urmatorii doi-trei ani.

Sunt in functiune tot turbinele alea: mici, la mana a doua, cu o uzura fizica de aproximativ 10 ani si morala de o generatie. Celebrii 10MW instalati de energie eoliana din Romania.

Turbinele Suzlon, ale Martifer, langa Babadag

Turbinele Suzlon, ale Martifer, langa Babadag

Am fost sa vedem depozitul de turbine (nacele, turnuri, elice) al celor de la Martifer, pentru proiectul de la Babadag. Au pregatit deja drumurile de acces pana la o parte din amplasamente, au inceput sapaturile pentru fundatii si cam atat. Oricum, e impresionant sa vezi 100 de milioane de materiale pazite de un singur paznic neputincios. E drept ca nici nu poti fugi cu o turbina sub brat 🙂

TULCEA - Turbina la mana a doua

TULCEA - Turbina la mana a doua

Am stat de vorba cu unul din mini-dezvoltatorii ad-hoc, cel care are turbina de langa statia de benzina de la Nalbant. Face parte din majoritatea de 90% din cei care au luat trei parcele de pamant, cateva avize, au turnat o fundatie, au adus o turbina scoasa la casare in Germania si isi fac „parc eolian”.

 

Fundatie turbina eoliana Nalbant
Fundatie turbina eoliana Nalbant

 

Acum cauta investitori care sa cumpere mori pentru restul de pamant si sa imparta partile sociale. Pentru cine e interesat, mai sunt vreo 200 ca el in Tulcea, si anume toti cei care au crezut ca asta e meseria sau care au mizat pe fonduri europene. Inca o vorba despre „proiectul” lui, in curs de realizare: e intr-o zona protejata Natura 2000. Deci se poate. Cum? Vezi parerea mea aici.

Din punct de vedere al conectarii la retea, vestile sunt ca expira zeci de ATR-uri (avize tehnice de racordare) in fiecare luna. Daca mergeti la ISPE sau Trapec sa puneti o intrebare, ca alte sute de oameni, primul raspuns e „nu”. „Pana la Dumnezeu, te mananca sfintii”. Daca ajungeti la ENEL Constanta, deja vi se spune ca se poate rezolva. Clientii mei vor face, probabil, doua parcuri de 8 sau 10 megawati in loc de unul singur mai mare 😉

Pe scurt, industria se restrange si profesionalizeaza, sunt in continuare multi investitori insa acum apar si multe proiecte la vanzare care sunt deja antamate. Lucrurile se misca, insa romaneste.

– in brief, in English–

 

Martifer project in Babadag with Suzlon turbines: the turbines are delivered, some roads are complete, work began for the foundations.Small unprofessional project developers are looking for investors.

Access road - Babadag, Tulcea, Romania

Access road - Babadag, Tulcea, Romania

Everything can be arranged, ‘the Romanian way’. No, really.

Radu Voinescu

Energie eoliana

Din fabulatiile imobiliare romanesti

publicitate online

publicitate online

Un om dornic de imbogatire peste noapte, insa care, ca si altii, nu stie prea bine despre ce vorbeste: are niste teren in Tulcea si crede ca orice teren in Tulcea este de fapt o mina de aur deghizata in ciulini. Si-a postat oferta pe un site (www. terendelta4 . zile . ro, nu dau link ca sa nu ii fac reclama in Google din greseala) si a cumparat si publicitate online. In ce consta oferta? Consta in 10 hectare la 14.000 de euro bucata, adica in total 140.000 de euro. Hai sa vedem pentru ce ati da banii respectivi: Pe 10 hectare s-ar putea instala maxim 3 mori de mari dimensiuni, daca configuratia terenului ar fi conceputa ideal pentru parcuri eoliene, ceea ce nu se prea intampla in Romania. Adica e posibil si sa poti instala doar o singura moara, sau doua mai mici, sau poate niciuna, si asta din punctul de vedere al micrositing-ului.

Viteza medie a vantului la 80 de metri e de 6.5-6.7 m/s. Un model de turbina de 2MW pe care il folosesc in prioritate la simulari ar produce anual, daca ar fi  plasat pe coordonatele furnizate de omul nostru, 5860 MWh, adica 2880 de ore echivalente pe an. Asta fara factor de shading, adica daca fiecare turbina este pozitionata fata de cealalta astfel incat sa nu se influenteze reciproc deloc. Vantul dominant ca si frecventa si putere, e predominant din nord (sectoarele 1 si 16 de pe roza vanturilor).  Nu e un teren atat de bun incat sa justifice un pret de 7-10 ori mai mare decat pentru un teren agricol obisnuit. La pretul asta, proprietarul sa fie dispus sa isi asume riscul dezvoltatorului, si anume sa fie platit cand incepe productia de energie, daca se dezvolta vreun mini-parc eolian pe parcela lui.

Ca sa va spun sincer, poate as da 14 mii de euro pe un hectar daca terenul ar fi pe panta nordica a dealului astuia: N45.117767 E28.959223, aflat la doar 2km in linie dreapta de „terenul de aur” caruia i se face reclama.

Dar ce ar zice Consiliul Judetean si Agentia de Protectie a Mediului de terenul oferit in exemplul de fata? E in plina zona protejata Natura 2000. Sansele sa faci ceva acolo fara un consultant de mediu extrem de bun sau fara sa dai spaga? Aproape zero.

Am numit impreuna cu alti dezvoltatori acest sindrom „goana dupa aur”. Adica ai o palma de pamant agricol intr-o zona unde ai auzit ca bate vantul si te gandesti sa ceri, de ce nu, de 10 ori pretul, ca fix acolo vor veni strainii sa puna mori de vant, nu la vecinul, ca la el nu „s-a dat vant” ca la tine. Ei bine, daca vreti intr-adevar profituri mai mari din vanzarea de pamant, va trebui sa va asumati riscul non-dezvoltarii proiectului impreuna cu dezvoltatorul, adica sa ii dati o optiune de cumparare si sa fiti platiti la lansare, sau sa ramaneti actionari 1-2%. Parerea mea.

Cele bune!

Dobrogea e plina…

…cel putin de intentii marete. Am vazut azi harta retelelor pe Tulcea si Constanta, cu capacitatea autorizata in diverse faze. Doar 30 de MW la Fantanele sunt in ultima faza, cu adevarat gata de bagat in priza. Restul e mai mult sau mai putin la stadiu de intentie sau de autorizare intermediara. Multe ATR-uri luate, insa ca sa semnezi Contractul de Racordare trebuie sa arati ca ai sau poti face rost de banii pentru dezvoltarea proiectului, si aici multi „viteji” se ineaca. Mai ales ca ATR-ul e valabil doar 6 luni si se poate prelungi doar o data, cu inca 6. Asa ca cine nu are ATR, sa astepte, ca se va mai elibera peisajul de dezvoltatori cu ghilimele, din care sunt sigur ca stim cu totii cel putin cativa.

Lansez o intrebare-pariu: cati MW credeti ca vom vedea instalati si in functiune la sfarsitul lui 2009? Dar 2010?

Toate cele bune!